1. Water-cement ratio is:

2 / 30

2. If the water-cement ratio of concrete is 0.6, then water required for mixing concrete is:

3 / 30

3. The roof sloping in four directions is called:

4 / 30

4. For road pavements, the cement generally used is:

5 / 30

5. Los Angeles machine is used to test the aggregate for:

6 / 30

6. A through stone should be provided in a stone masonry at a distance not exceeding:

7 / 30

7. The ratio of various ingredients (cement, sand, aggregates in concrete) of grade M150 is:

8 / 30

8. Percentage of pozzolanic material containing clay up to 80% used for the manufacture of pozzolana cement is:

9 / 30

9. The top diameter, bottom diameter, and the height of a slump mold are:

10 / 30

10. The commercial name of white and colored cement in Nepal is:

11 / 30

11. For the construction of thin R.C.C. structures, the type of cement to be avoided is:

12 / 30

12. Formwork suitable for construction work:

13 / 30

13. The concrete mix which causes difficulty in obtaining a smooth finish is known to possess:

14 / 30

14. The main component of pozzolana is:

15 / 30

15. Moisture content of aggregate is determined by:

16 / 30

16. From an earthquake safety perspective, the floor-to-floor wall height of the building should be?

17 / 30

17. The maximum thickness of door shutters provided in doors is:

18 / 30

18. The fineness of cement is measured in terms of?

19 / 30

19. A bifurcated stair is normally used in:

20 / 30

20. A series of steps without any platform in a stair is:

21 / 30

21. A small window in which shutters are allowed to swing around pivots fixed to the window frame is:

22 / 30

22. Proper proportioning of concrete ensures:

23 / 30

23. High temperature:

24 / 30

24. Which sequence is correct with respect to the removal of formwork?

25 / 30

25. Minimum number of test specimens required for finding the tensile strength of concrete is:

26 / 30

26. The line of intersection of the sloping surface of the slope roof having an internal angle less than 180┬░ is called:

27 / 30

27. If the effective working time is 7 hours and the per batch time of concrete is 3 minutes, the output of a concrete mixer of 150-liter capacity is:

28 / 30

28. The wooden piece joining the bottom ends of rafter is called:

29 / 30

29. The members which support covering materials of a sloping roof are:

30 / 30

30. To prevent segregation, the maximum height for placing concrete is:

Your score is

Share your achievement.

LinkedIn Facebook Twitter
0%

Please write your feedback

Thanks for giving your valuable feedback.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top