1. The W/C ratio of ferrocement should be......than normal concrete:

2 / 30

2. Which sequence is correct with respect to the removal of formwork?

3 / 30

3. Workability increasing admixture is used in concrete to?

4 / 30

4. In stairs, stringers are:

5 / 30

5. The final operation of finishing floors is known as:

6 / 30

6. The vertical member provided at the top and bottom ends of a flight supporting the handrail is:

7 / 30

7. The aggregate containing moisture in pores and having its surface dry is known as:

8 / 30

8. The members which support covering materials of a sloping roof are:

9 / 30

9. The bulk density of an aggregate does not depend upon:

10 / 30

10. The percentage of the aggregate of F.M. 2.6 to be combined with coarse aggregate of F.M. 6.8 for obtaining the aggregates of F.M. 5.4 is:

11 / 30

11. The bulking of aggregates is due to:

12 / 30

12. The line of intersection of the sloping surface of the slope roof having an internal angle less than 180┬░ is called:

13 / 30

13. The projections of the head or sill of a door or window frame are known as:

14 / 30

14. If the ratio of concrete ingredients, i.e., cement, sand, and aggregates are in the ratio 1:3:6, the grade of concrete is:

15 / 30

15. Pick up the correct statement from the following:

16 / 30

16. Moisture content of aggregate is determined by:

17 / 30

17. With the rise in the temperature of atmospheric air, the setting time of cement:

18 / 30

18. Sukhi is added to lintel mortar to:

19 / 30

19. If x, y, and z are the fineness moduli of coarse, fine, and combined aggregates, the percentage (p) of fine aggregates to combined aggregates is:

20 / 30

20. If the effective working time is 7 hours and the per batch time of concrete is 3 minutes, the output of a concrete mixer of 150-liter capacity is:

21 / 30

21. A roof sloping in four directions but with a break in slopes is called:

22 / 30

22. The resistance of an aggregate to compressive force is known as?

23 / 30

23. Minimum number of test specimens required for finding the tensile strength of concrete is:

24 / 30

24. The height of the slump cone is kept:

25 / 30

25. The fineness of cement is tested by:

26 / 30

26. Slump test of concrete is a measure of its?

27 / 30

27. Maximum permissible unit of magnesia concentration in ordinary Portland cement is:

28 / 30

28. A through stone should be provided in a stone masonry at a distance not exceeding:

29 / 30

29. The roof sloping in two directions is called:

30 / 30

30. The unit weight of RCC is taken as:

Your score is

Share your achievement.

LinkedIn Facebook Twitter
0%

Please write your feedback

Thanks for giving your valuable feedback.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top