Construction Management Online MCQ Test – Paper-1

0%
0 votes, 0 avg
5
Created by Nepal Lok Sewa

This is a FREE  Online MCQ test. Beware of scammers who ask for money to attend this test.

  • Total number of questions: 20
  • Time allotted: 30 minutes
  • Passing Score: 30%
  • Certificate: No
  • Random questions: No
  • Do not refresh the page
  • All the best!

1 / 20

1. CPM network is:

2 / 20

2. In CPM analysis:

3 / 20

3. CPM family includes:

4 / 20

4. The term CPM in construction management is an abbreviation of:

5 / 20

5. The interrelationship between the functional elements of a program is achieved through:

6 / 20

6. A milestone chart:

7 / 20

7. Milestone charts are developed in:

8 / 20

8. On a bar chart, the various activities of a project are shown by:

9 / 20

9. Bar charts are considered suitable for:

10 / 20

10. The weakness in bar charts is:

11 / 20

11. A drawback of a bar chart is:

12 / 20

12. Henry Gantt developed the bar chart technique in:

13 / 20

13. Jobs going ahead of schedule are conveniently shown in:

14 / 20

14. Gantt chart indicates:

15 / 20

15. The pictorial representation of activities and events of a project is known as:

16 / 20

16. Policy is:

17 / 20

17. A construction schedule is prepared after collecting:

18 / 20

18. The 1st stage of construction is:

19 / 20

19. A golden rule for the procurement of construction work suggests:

20 / 20

20. Railway projects are treated as:

Your score is

Share your achievement.

LinkedIn Facebook Twitter
0%

Please write your feedback

Thanks for giving your valuable feedback.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top