Construction Management Online MCQ Test – Paper-2

0%
0 votes, 0 avg
3
Created by Nepal Lok Sewa

This is a FREE  Online MCQ test. Beware of scammers who ask for money to attend this test.

  • Total number of questions: 30
  • Time allotted: 30 minutes
  • Passing Score: 40%
  • Certificate: No
  • Random questions: Yes
  • Do not refresh the page
  • All the best!

1 / 30

1. The occurrence of the completion of an activity is called its:

2 / 30

2. The completion report includes:

3 / 30

3. The figure indicates:

4 / 30

4. PERT technique of network analysis is useful for:

5 / 30

5. Who is responsible for accidents occurring at the site?

6 / 30

6. A dummy activity in CPM:

7 / 30

7. The objective of technical planning is:

8 / 30

8. tij and tijE indicate the time required for the completion of an activity in CPM and PERT, respectively. Here the subscript E stands for:

9 / 30

9. The area under the B-curve is divided into two equal parts by:

10 / 30

10. Direct cost of a project is due to:

11 / 30

11. Of the following, the PERT event is:

12 / 30

12. An example of a parallel activity is:

13 / 30

13. Which type of tender generally prefers the schedule of rate?

14 / 30

14. Critical path network helps the engineer to:

15 / 30

15. In CPM method, the earliest finish is indicated by time on:

16 / 30

16. The salient feature of functional organization is:

17 / 30

17. In time cost optimization using CPM, the crashing of activities along the critical path is done starting with the activity having:

18 / 30

18. The square root of the variance is known as:

19 / 30

19. The cost corresponding to crash time is:

20 / 30

20. Probability factor in PERT is given by:

21 / 30

21. A frequency distribution curve:

22 / 30

22. Free float is the:

23 / 30

23. The technique for establishing and maintaining priorities among various jobs of a project is known as:

24 / 30

24. The maximum amount for the approval of tender by Gazetted 3rd class officer is:

25 / 30

25. Time and progress chart of construction is known as:

26 / 30

26. Line of balance technique is used for:

27 / 30

27. Tender documents do not contain:

28 / 30

28. If, for an activity, the optimistic time is 1 day, pessimistic time is 11 days, and the most likely time is 3 days, then the expected time is:

29 / 30

29. Negative slack occurs:

30 / 30

30. The latest allowable time for any event i is equal to:

Your score is

Share your achievement.

LinkedIn Facebook Twitter
0%

Please write your feedback

Thanks for giving your valuable feedback.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top